Starting the DPU
12. Verify that the Net A and Net B LEDs are green.
13. Verify that the Backup LED is off.
14. Verify that the CP LED is blinking green/yellow.
15. Verify that the IOM LED is green.
16. Verify that the State LED is green.
17. Verify that four I/O LEDs are off (there is no database in the DPU).
18. Verify the DPU shows up as healthy in the HealthLog list and that it
is communicating on the network.
19. Verify that it is running the proper versions of DPU firmware (refer
to the chapter on flashing the DPU).
20. Download the DPU using the maxDPUTOOLS program in the
maxSTATION.
21. Acknowledge all alarms from the DPU and make sure that they all
clear.
22. Verify that the I/O LEDs that represent cards in your database and
I/O racks are now green.
23. Run the DLFreezeCheck program, on the maxSTATION, to unfreeze
the outputs and allow all or selective outputs to go to their new
computed values.
24. Place the key switch in the Run or Locked mode.
Starting a Backup Pair of DPUs
When starting a backup pair of DPUs, it is recommended that you bring
the primary DPU up first and make sure it is running properly before
starting the secondary. Perform the following steps to ensure that an
unexpected failover does not occur during the startup process.
To start DPU backup pairs:
1. Turn the DPU key switch of both the primary and secondary DPU to
the Off-line position (fully counter-clockwise).
2. Set the front panel mode switch of both DPUs to “B” to demand a Cold
startup, as described in the preceding section if necessary.